BIM-Integrated Issue Management

fig1.PNG

In this Viewpoint article, Erik Pijnenburg, CEO of KUBUS BV, discusses the importance of integrated and centralized BIM issue management, not only to improve the quality of BIM data, but also of the design process in AEC.

Integrated issue management enables multi-disciplinary design teams to improve early design knowledge-sharing. In later phases, clash detection or advanced model checking is helpful for quality assurance, but being able to find clashes without a structured way to get them solved does not guarantee high quality model-data. Without integrated BIM issue management, projects will continue to deal with issues on an ad hoc basis and will never reach a point where the data has no defects anymore before construction starts. A dedicated issue-management tool that can organize and help to resolve the large number of issues in AEC projects is essential to creating the high-quality BIM data for successfully executing these projects.

URL: http://www.aecbytes.com/viewpoint/2018/issue_87.html

Leave a Comment

Fill in your details below or click an icon to log in:

WordPress.com Logo

You are commenting using your WordPress.com account. Log Out /  Change )

Google+ photo

You are commenting using your Google+ account. Log Out /  Change )

Twitter picture

You are commenting using your Twitter account. Log Out /  Change )

Facebook photo

You are commenting using your Facebook account. Log Out /  Change )

w

Connecting to %s